At long last, Real Time Passenger Information, RTPI, is finally being installed at some of our Bus stops in West Harnham.
Units have already been installed in Essex Sq & Norfolk Rd and it looks as if Middle St will soon be done, as the lamp post has been replaced. Works are being prepared on converting some of our other stops around West Harnham.
West Harnham was originally omitted from the scheme in 2003 and Murial and I have campaigned ever since to be included. Funds are being used which have come from the former Wellworthy site, which were allocated to West Harnham for transport issues.
The converted stops will eventually count down from 20 minutes, to when the Bus actually arrives.